Distribution Fault Study
11 kV radial feeder protection simulator
Calculated
Single-Line Diagram
Calculated Results
Elevated
✓
Operate Fuse-1
Primary clearing in 1.36 s
| Priority | Device | Trip Time |
|---|
Time-Current Coordination
Study Notes
Calculations use a transparent per-unit approximation for study comparison. Real protection settings must be validated against utility standards, manufacturer curves, arc-flash requirements, and field measurements.
- Base Current
- 524.86 A
- Total Impedance
- 0.101 pu
- Backup Device
- CB-2 Relay